In our 55-year-old history, CGP has successfully completed over 15,000 projects in the fields of infrastructure construction, building construction, maintenance of roads, and investment engineering.
Construction of the Rubik – Rreshen Highway, lot3, included the construction of the highway, 7 bridges, reinforced concrete box culverts and the entire required infrastructure. Our part of the route (8 km) was constructed in cooperation with a subcontractor from Albania and was completed within the given deadline. The project was financed by a global bank.
Back to Our Work