In our 55-year-old history, CGP has successfully completed over 15,000 projects in the fields of infrastructure construction, building construction, maintenance of roads, and investment engineering.
The existing building was partially removed at the location of the planned private vascular clinic. The western part of the existing building was preserved; basement, ground floor and attic part of the workshop.The new building is partially underground. Top view outline of the ground floor part of the building measures 30.56 x 27.40 m. The height dimensions are B + G + F + A. The building is 11.30 m high over the marked dimension of the ground floor.The gross surface area is 1,915.20 m2. The net surface area is 1,619.90 m2.The basement includes service areas, the ground floor is intended for the acceptance of patients and offices. The floor holds two surgery block and all the accompanying premises with patient rooms. The attic is intended for two above-standard patient rooms and an area for AC and boiler room for the entire building. The external area includes a partial reconstruction of the building and the construction of new connections to the public infrastructure.
The existing building was partially removed at the location of the planned private vascular clinic. The western part of the existing building was preserved; basement, ground floor and attic part of the workshop.
The new building is partially underground. Top view outline of the ground floor part of the building measures 30.56 x 27.40 m. The height dimensions are B + G + F + A. The building is 11.30 m high over the marked dimension of the ground floor.
The gross surface area is 1,915.20 m2. The net surface area is 1,619.90 m2.
The basement includes service areas, the ground floor is intended for the acceptance of patients and offices. The floor holds two surgery block and all the accompanying premises with patient rooms. The attic is intended for two above-standard patient rooms and an area for AC and boiler room for the entire building. The external area includes a partial reconstruction of the building and the construction of new connections to the public infrastructure.