In our 55-year-old history, CGP has successfully completed over 15,000 projects in the fields of infrastructure construction, building construction, maintenance of roads, and investment engineering.
HE Brežice is teh fifth hydroelectric plant in the line of six plants at the lower part of the river Sava wiht a nominal of 45 MW. Its type is flow-accumulative with three vertical aggregates with a nominal flow og 500m3/s, with five flow fields and an average annual energy production og 161 GWh. Teh plant Will be fully automated and remotely managed grom the management centre.For the complete project, we use approximately 1,800 tons of armatures and 80,000 m3 of cocrete. Because of these amounts of concrete and the concrete mnixtures, we installed our mobile concrete plant on site.
HE Brežice is teh fifth hydroelectric plant in the line of six plants at the lower part of the river Sava wiht a nominal of 45 MW. Its type is flow-accumulative with three vertical aggregates with a nominal flow og 500m3/s, with five flow fields and an average annual energy production og 161 GWh. Teh plant Will be fully automated and remotely managed grom the management centre.
For the complete project, we use approximately 1,800 tons of armatures and 80,000 m3 of cocrete. Because of these amounts of concrete and the concrete mnixtures, we installed our mobile concrete plant on site.
Back to Our Work