In our 55-year-old history, CGP has successfully completed over 15,000 projects in the fields of infrastructure construction, building construction, maintenance of roads, and investment engineering.
The project included removing the level crossing of the double track train line and moving the road and constructing an overpass over the track. We also constructed a crossroads with the existing local road including traffic lights. The overpass is built with a prestressed reinforced concrete frame and a carrying construction. The special element of this project was constructing the carrying construction over the track that consist of two elements for each driveway that ware lifted and installed using a mobile crane with a 500 t capacity. During the whole construction time, train traffic was only obstructed 2 times for 1 hour during lifting of the supporting elements.The construction was completed 15 days before the deadline. This project was a turn-key implementation.
The project included removing the level crossing of the double track train line and moving the road and constructing an overpass over the track. We also constructed a crossroads with the existing local road including traffic lights. The overpass is built with a prestressed reinforced concrete frame and a carrying construction. The special element of this project was constructing the carrying construction over the track that consist of two elements for each driveway that ware lifted and installed using a mobile crane with a 500 t capacity. During the whole construction time, train traffic was only obstructed 2 times for 1 hour during lifting of the supporting elements.
The construction was completed 15 days before the deadline. This project was a turn-key implementation.
Back to Our Work